Projects
Some of our recent projects.
Customer Name | Scope of work | Location |
---|---|---|
Facade Solutions | Supply and install central and split A/C | BIC- Dragster Tower - Bahrain |
Shk. Salamn 10 storey Bldg.) | Supply & install central A/C units complete with ducting. | Seef Area - Bahrain |
Taqi Mohammed Al Baharna Trading Est. Durrat Al Bahrain – Atoll 1(10 villas) |
Ducted split units installation & commissioning .Duct fabrication |
Bahrain |
Lockman Group (Private Villas) | Ducted split units installation & commissioning | Busaiteen – Bahrain |
Gulf House engineering | Inline exhaust fans installation Vent. Duct works fabrication & erection |
Um Al Hassam – Manama – Bahrain |
Private villa ( Mr. Wasif) | Package, ducted split & split units installation. Duct Fabrication & erection | Hamad Twn – Bahrain |
Private villa ( Mr. Rafik George) | Supply & install package/central A/Cs with ducting & grilles | Sanad – Bahrain |
Akbari Gardens | Supply & install central A/Cs with ducting & grilles | Sanad _ Bahrain |
United Electronics | Supply & install duct & grilles | Saar & Sanad – Bahrain |
Vomm (Tubli water treatment station) | Supply & install split units. Yearly maintenance contract |
Tubli – Bahrain |
Taqi Mohammed Al Baharna Trading Est |
Ducted split
|
Various sites - Bahrain |
E.R.E & Duct Master are the extensions of our existing company in Egypt (Middle East Trading & contracting Co.) which has held a first- rate standing in the same field since 1997.
Following are some of the projects accomplished by the same staff.
Project Name | Scope of work | Location |
---|---|---|
Movenpeak Staff accommodation | Split units installation | Sharm El Shaik-Egypt |
Military forces Social Club | Central, split & freestanding units' installation, Ducting works. | Al Salam Ct. - Egypt |
Xerox- Egypt | Package units & ventilation system installation & duct works (fabrication & erection) | Cairo – Alex Desert high way |
Petro-Alam | Ducted split units installation & duct works (fabrication & erection) | Cairo- Maadi |
Z – Overseas | Ducted split units installation & duct works (fabrication & erection) | Various locations ( Cairo, Sinai & Ahmed Orabi) |
El Seweedy Plastic Factory | Split units installation | Tenth of Ramadan Industrial City |
Coca Cola Academy | Ducted split & Package units installation & duct works (fabrication & erection) | Nasser City (Free Zone) |
Mac Donald's | Remodeling & Servicing of HVAC (Package, ducted split & Ventilation systems) | All over Egypt ( Cairo, Hurgada) |
Alam Sons | Split units installation & service | Cairo & Alexandria |
Restaurand and Shops | |||||
S.No | Restaurand and Shops | Cooling Capacity | Client/Contractor | Project Desription | |
---|---|---|---|---|---|
1 | House Boat Restaurant | Design, Supply & install Commercial Kitchen Hood | |||
2 | Necolas Restaurant | 30 Tons | Mr. Fadi Kfoury | Designing of HVAC system, includes Heat Load calculations, Duct works sizing * routing, electrical load & drainage, Finally auto cad shop drawings.Fabrication of at duct works at our facility using eitherpre-insulated sheets or G.I. sheets. Supply and install Central Ducted Split AC units, design, supply and install Exhaust Freshair system | |
3 | Solidare Café' (3 Branches) | 49 Tons | Mr. Abdulla | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
4 | Saar Italian Restaurant (?) | 15 Tons | Mr. Amjad | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
5 | Havana Café | 15 Ton | Mr. Omar | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
6 | Expression (Computer Shop)- Al Hayatt Mall | 8 Ton | Mr. Mohamed Shabib | Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
7 | Innovation (Furniture Shop) Saar Mall | 10 Ton | Mr. Ahmed | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install CentralDucted Split Units. | |
8 | Sparks Salon (Ladies Salon) - Isa Town | 12 Ton | Dream Pools | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
9 | Hypoxi Clinic (Isa town) | 15 Ton | Abeer Akbari & Associates | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
10 | Dream Body Centre (Bahrain Mall) | 25 Ton | Modi Décor | "Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Design, supply and install Exhaust/ Freshair Systems for Bathrooms and Kitchens. Supply and install Chilled Water Fan Coil Units or Air Handling Units complete with pipes connections, strainers, valves & measuring gauges." | |
11 | Equilibrium Fitness - Lagoon, Amwaj | 9 Ton | Mr. Fady Kabalaoui | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Chilled Water Fan Coil Units or Air Handling Units complete with pipes connections, strainers, valves & measuring gauges. Design, supply and install Exhaust /Freshair systems for Bathrooms and Kitchens. | |
12 | Saar Mall Accessories | 6 Ton | Mrs. Fatima | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Chilled Water Fan Coil Units or Air Handling Units complete with pipes connections, strainers, valves & measuring gauges. | |
13 | Maya Jewelry (Seef Mall) | 4 Ton | Mr. Ahmed Zahid | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Chilled Water Fan Coil Units or Air Handling Units complete with pipes connections, strainers, valves & measuring gauges. | |
14 | Bab AL Bahrain Mall | 2 Ton | Mrs. Fadwa | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Chilled Water Fan Coil Units or Air Handling Units complete with pipes connections, strainers, valves & measuring gauges. |
Commercial Buildings /Factories | |||||
1 | 10 Storey Bldg. - Seef | 203 Tons | Sh. Salman Bldg./ Al Mohandis Engineering | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings.Supply and Install Central Ducted Split Units. | |
2 | 4 Storey Bldg. (Adliya) | 70 Tons | Sh. Salman Bldg./ Al Mohandis Engineering | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
3 | 7 storey Bldg. (Juffair) | 143 Tons | Al Koheji/ Dream Pools | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
4 | 4 Storey Store Bldg. (Juffair) | 70 Tons | Al Ehsan Contracting | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. | |
5 | 10 Storey Bldg. (Gudaibiya) | 200 Tons | Bawab Contracting | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
6 | Urban Planning Bldg. | 235 Tons | Rashid Janahi/ Abeer Akbari A& Associates | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
7 | 4 Storey Building (Busaiteen) | 25 Tons | Mohamed Al Kowary | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units. | |
8 | A'ali Mosque | 80 Tons | Dream Pools | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
9 | 4 Storey bldg. (East Riffa) | 54 Tons | Al Nakheel Tower Contracting | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Supply and install Central Ducted Split Units. | |
10 | Gulf Mart (Muharraq) | 105 Ton | Bahrain Mall Management | Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Central Ducted Split Units. | |
11 | Zamil Tower (17th & 19th Floors) | Archi Corp. | Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. | ||
12 | Ramada Hotel (lobby) | Modi Décor | Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. | ||
13 | Meba Steel Factory (Askar) | 42 Tons | MEBA | Supply and install Central Ducted Split units. | |
14 | Al Meshal Chemical Factory (Askar) | 35 Ton | Yousef Meshal | Supply and install Central Ducted Split units. | |
15 | Bell Factory (Sakir) | 475 Ton | BIC | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets.Supply and install Central Ducted Split AC units.Design, Supply & install Commercial Kitchen Hood. | |
16 | Kraft Factory (Hidd) | Kraft / Rumaitha | Stainless steel cladding for insulated pipes. | ||
17 | Al Manhal Water Plant (Sehla) | 74 Tons | Al Manhal | Designing of HVAC system, includes heat load calculations, duct works sizing & routing, electrical loads & drainage, finally auto cad shop drawings. Supply and install Central Ducted Split Units. Fabrication of at duct works at our facility using either pre-insulated sheets or G.I. sheets. Supply and install Central Ducted Split Units/ Central Package Units. | |
18 | Tubli Water Treatment Station | 56 Ton | Vomm | Supply and install Central Ducted Split units. | |
19 | Extra (Tubli) |
Private Villa | ||||
* More than 45 Villas ranging from small to large sizes. | 12 to 60 Tons |
Sub-Contracting HVAC works from AC Agents. | ||||
1 | Yateem AC (Carrier) | |||
2 | Taqi Al Baharna (Mitsubishi) | |||
3 | United Electric (Nihon) |
Servicing & Maintenance Contract | ||||
1 | Durrat Al Bahrain -2011 up to date | Maintaining, cleaning & servicing AC units (Split, Central, Package & Chilled Water) also Exhaust Fans Systems. | ||
2 | Tala Island- 2013 upi to date | |||
3 | Dana Flats- 2011 upi to date | |||
4 | Solara1- 2012-2013 | |||
5 | Tamkeen (Bait Al Tujair)- 2012 up to date |